Originally Posted by
Witton Park
Are you comparing when they both run at capacity? The problem with wind is they often don't.
Are you sure it's 100 as well? It would seem you should have added a 0 for most of the installed turbines.
Heysham 1150 MW and a turbine up to 1.5MW.
Yes I know they have some recently installed turbines at a declared 8MW but when they only run at 30% capacity (typical) you're still looking at close to 500 of these to match Heysham 1.