Quote Originally Posted by Witton Park View Post
Are you comparing when they both run at capacity? The problem with wind is they often don't.

Are you sure it's 100 as well? It would seem you should have added a 0 for most of the installed turbines.

Heysham 1150 MW and a turbine up to 1.5MW.

Yes I know they have some recently installed turbines at a declared 8MW but when they only run at 30% capacity (typical) you're still looking at close to 500 of these to match Heysham 1.
8MW run at 8MW at wind speeds as low as 10m/s, not hard offshore, next generation will be 15MW and beyond 1.5MW is old news, 3.6MW is industry standard